Posts by jetcreative

Air Force Base Project

25,000 tons of non-hazardous, RCRA, and PCB soil. Utilized 4 separate hazardous and non-hazardous landfills. Utilized 6 separate transporters. Drivers required weekly passes to gain access to the site. AWMS managed all aspects of this project including: scheduling 60 loads per day from the site, site and transporter approval, manifesting, and billing with backup documentation.…

Read More

Government Project in New Jersey

40,000 tons of TSCA and 1,000 tons of mixed RCRA/TSCA. Material was transported via rail. AWMS managed all aspects of this project including waste approval, coordination of loading, scheduling transporters to the rail site, manifesting, and billing with backup documentation.

Read More

Aeronautics Launch Pad Project

10,000 tons of non-hazardous material from launch pad. Transporters required pre-qualification, proof of citizenship and entry badges. Non-hazardous landfill was new and required qualification and site visit. AWMS managed all aspects of this project including: scheduling, site and transporter approval, manifesting, and billing with backup documentation. This job was very logistics driven.

Read More

Future Gas Site Project

7,829 tons of RCRA hazardous waste, 782 loads. Transportation only to non-hazardous landfill of 8,621 tons, 460 loads. Utilized 8 separate trucking companies. Scheduling required roll-off loads delivered by 10:00 am and dumps delivered by 9:00 pm in 20 minute increments because of facility mix tank.  Project took place in 4th quarter and 1st quarter.…

Read More