Air Force Base Project

  • 25,000 tons of non-hazardous, RCRA, and PCB soil.
  • Utilized 4 separate hazardous and non-hazardous landfills.
  • Utilized 6 separate transporters.
    • Drivers required weekly passes to gain access to the site.
  • AWMS managed all aspects of this project including: scheduling 60 loads per day from the site, site and transporter approval, manifesting, and billing with backup documentation.
  • AWMS was able to manage this project without demurrage charge, even though the job was routinely shut down for Air Force traffic.